Transitioning to the Job Site

Before going to the job site, carefully review Minimum Requirements. Then:

  1. Disconnect the power. (See Connecting Power.)

  2. Disconnect the Ethernet connection (if not PoE). (See Connecting Ethernet.)

  3. Attach any relevant antennas now or on the job site. [See (Optionally) Installing the Wi-Fi Antenna and (Optionally) Installing the Antennas Remotely.]

  4. Transport the gateway to the job site to complete the permanent installation.

Continue to On-Site Installation.